This is Complete Operator’s Manual for Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K Hydraulic Excavator .
Your machine has been designed and built to the highest standards of quality. It conforms to all current safety regulations. However, the risk of accidents can never be completely excluded. That is why it is essential to observe elementary safety rules and precautions.
Please read this manual carefully, paying particular attention to the instructions concerning safety, operation and maintenance so as to avoid the risk of injury while operating or servicing the machine. Reading operating manual will help you and others avoid personal injury or damage to the machine. The information provided in this manual will provide the operator with the safest and most efficient way to use the machine. Knowing how to operate the machine safely and correctly will enable you to train others to operate the machine.
Use this Komatsu PC210-7K, PC210LC-7K, PC210NLC-7K, PC230NHD-7K, PC240LC-7K, PC240NLC-7K Hydraulic Excavator operator’s manual as a guide, Your machine will remain a reliable working tool provided it is kept in good working condition and serviced properly.
Models Covered:
PC210-7K – K40001 and up
PC210LC-7K- K40001 and up
PC210NLC-7K – K40001 and up
PC230NHD-7K – K40001 and up
PC240LC-7K – K40001 and up
PC240NLC-7K – K40001 and up
Manual Covers:
FOREWORD
FOREWORD
SAFETY INFORMATION
INTRODUCTION
PRODUCT INFORMATION
SAFETY
SAFETY INFORMATION
POSITION FOR ATTACHING SAFETY LABELS
SAFETY INFORMATION
SAFETY MACHINE OPERATION
SAFETY MAINTENANCE INFORMATION
OPERATION
GENERAL VIEW
EXPLANATION OF COMPONENTS
MACHINE OPERATIONS AND CONTROLS
TRANSPORTATION
COLD WEATHER OPERATION
LONG TERM STORAGE
TROUBLESHOOTING
MAINTENANCE
MAINTENANCE INFORMATION
LUBRICANTS, COOLANT AND FILTERS
WEAR PARTS LIST
USE OF FUEL, COOLANT AND LUBRICANTS ACCORDING TO AMBIENT TEMPERATURE
TIGHTENING TORQUE SPECIFICATIONS
PERIODIC REPLACEMENT OF SAFETY CRITICAL PARTS
MAINTENANCE SCHEDULE
MAINTENANCE PROCEDURE
SPECIFICATIONS
SPECIFICATIONS
ATTACHMENTS AND OPTIONS
GENERAL PRECAUTIONS
HANDLING BUCKET WITH HOOK
MACHINES READY FOR ATTACHMENTS
ATTACHMENT GUIDE
RECOMMENDED ATTACHMENT OPERATIONS
2-PC BOOM
STRAIGHT BOOM PC210/240-7K
SUPER LONG FRONT BOOM AND ARM PC210/240-7
OPERATION INSTRUCTION FOR SUPER LONG FRONT BOOM AND ARM
MAINTENANCE
*****
====================
**Total Pages: 363
**File Format: PDF
**Language: English
**Requirements: Adobe PDF Reader & WinZip
**Compatible: All Versions of Windows & Mac, Linux OS, Iphone, Ipad, Android etc…
NO waiting! You will have instant access to your download! All pages are printable, No shipping fee, No waiting nervously for the postal delivery, you can start doing your repairs right away!
We will always try to get the full satisfaction of our customers. Even after you have purchased this manual, we will pay full attention to any issues, regardless of the nature of the situation.
THE DOWNLOAD LINK WILL ALSO BE SENT TO YOUR E-MAIL.
So please make sure your email address is correct. Don’t Forget to Check Spam / Junk if can’t find the new message in your email inbox immediately.
Any questions please contact: admin@servicemanualperfect.com
Thanks for visiting!